Teachers’ House: Floor Done, Walls Plastered

Good news from the teachers’ house! 🏠

The house now has a floor and the walls are plastered. So the teachers and older young people now sleep inside.

A man plastering an inside wall of the teachers’ house

Two men on wooden scaffolding plastering the wall under the roof

The teachers’ house from outside, a cargo tricycle with soil in front of it

What is still missing

What is still missing now are mattresses.

You can see how the house was built step by step right below.

How the teachers’ house was built

Until now our teachers stayed in a small settlement some way from the school – and we paid rent for it. Now we are building them their own house with two rooms, right on our grounds.

  • 2rooms
  • April 2026building began
  • 100 %our own fired bricks
1
April 2026Done

The shell

Our vocational students fired the bricks themselves – and everyone helps with the building. So the house grows row by row.

The walls of the teachers’ house going up, helpers on the building siteThe shell of the teachers’ houseBrickwork made of our own fired bricksHelpers building the teachers’ houseThe building site of the teachers’ house on the groundsBuilding work on the teachers’ house
2
June 2026Done

The house is standing

The roof is on, the house is standing. That’s a big step forward – because it brings several benefits at once:

  • We no longer have to pay rent.
  • The teachers are close to the children and can look after them.
  • We can house more children right on the grounds.
The teachers’ house with its roof, the openings for doors and windows still empty
3
August 2026Done

Doors and windows

All the doors and window shutters are in. Now the house has a roof and walls and is closed all round.

Front view of the teachers’ house with all the doors and windows fittedCraftsmen on wooden scaffolding fitting doors and windows
4
October – November 2026Done

Floor and inside walls

The interior work continued: inside we laid the floor and plastered the walls. Bit by bit it is becoming a real home, right next to our school.

  1. The house now has a floor and the walls are plastered. The teachers and older young people now sleep inside. What is still missing are mattresses.

Two men plastering the inside walls of the teachers’ houseThe newly laid floor in two rooms of the teachers’ houseA man plastering an inside wall of the teachers’ houseTwo men on wooden scaffolding plastering the wall under the roofThe teachers’ house from outside, a cargo tricycle with soil in front of it

The teachers live here now

Thank you to everyone who is helping, you are really building the children’s future with us! What is still missing are mattresses. Would you like to help?